Sourcing & Costs
Plan a Bag Test Order: Budget, Color Mix and Reorder Reserve
Choose the question your test order must answer, limit the number of variants, and reserve money for costs beyond the product invoice. Separate sample spending, the first sellable assortment, shipment costs and reorder cash. A small purchase is useful when its results can guide the next decision; a wide assortment with almost no depth can leave you with weak evidence and too many scattered units.
Draft editorial check:
On this page
- Calculation and purchase decision
- Decide what you are testing
- Give every variant a budget line
- An illustrative budget, not a quotation
- Compare cost per usable unit
- Set a reorder gate before you launch
- Sources and next step
- Request an itemized trial-order budget
- Sources and calculation method
- Questions before purchase
Calculation and purchase decision
For a transparent planning example, assume 24 units at 40 CNY = 960 CNY, China delivery 80, agent handling 100, inspection 120, packing 60 and international freight 480. The known subtotal is 1,800 CNY, or 75 per purchased unit. Add tax, payment and any other unresolved charges before calling it landed cost. If only 22 units are usable, the same subtotal is 81.82 per usable unit. These are assumed inputs, not a CBAG quotation or observed defect rate.
Leave any unquoted fee blank. Enter 0 only after the seller or service provider confirms that this item carries no charge. If the assumed sample/evaluation cost is 120 CNY, the known spending rises from 1800 to 1920 CNY, or 80 CNY per usable unit at 24 units. Holding 250 CNY for a later reorder gives a 2170 CNY planning cash floor, while unit spending stays 80 CNY. Tax and payment costs remain pending in this example; the reserve is not an expense.
Swipe the table horizontally to see all columns.
| Option / input | Recalculation | Decision |
|---|---|---|
| 24 usable units | 1800 ÷ 24 = 75.00 CNY | Base assumed case |
| 23 usable units | 1800 ÷ 23 = 78.26 CNY | +4.35% per usable unit |
| 22 usable units | 1800 ÷ 22 = 81.82 CNY | +9.09% per usable unit |
Decide what you are testing
A construction sample answers a different question from a retail assortment. You may first need to assess the opening, lining, dimensions and packing condition of one style. Buying every available color before that review increases exposure without resolving the main uncertainty.
For an assortment test, define a narrow question: whether one silhouette fits your customers’ use case, whether a neutral and an accent color receive different responses, or whether two sizes solve different needs.
Write the decision before ordering: “If the sample meets the agreed specification, compare two colors of the same style under similar selling conditions.” This is a proposed test plan, not a claim about any previous customer’s results.
Give every variant a budget line
Treat each style-size-color combination as its own SKU for planning, even if the seller groups them under one listing. Include hardware options when they affect purchasing or customer choice. A three-style selection with two sizes and three colors can create eighteen variants before you have purchased meaningful depth in any one of them.
Swipe the table horizontally to see all columns.
| Planning field | Record before purchase | Why it matters |
|---|---|---|
| Product identity | Link, SKU option, size, color and hardware | Prevents an ambiguous color split |
| Units | Requested and seller-confirmed quantity | Reveals minimum-order constraints |
| Product subtotal | Confirmed unit price multiplied by quantity | Separates goods from other charges |
| Shared costs | Domestic shipping, service, QC and packing scope | Avoids assuming every service is included |
| Export estimate | Destination, package assumptions and quote date | Shows what could change after packing |
| Reserve | Amount held outside the first purchase | Protects the next decision |
Ask whether the seller permits mixed colors and whether each color has its own minimum. Do not assume a listing’s headline quantity threshold applies to every combination. Resolve substitutions before payment: a missing accent color should not silently become another neutral unit.
An illustrative budget, not a quotation
Suppose a buyer sets aside USD 1,000 purely for a planning exercise. The following figures are invented allocations, not current 1688 prices, service fees, shipping rates or tax estimates:
Swipe the table horizontally to see all columns.
| Envelope | Hypothetical allocation |
|---|---|
| Samples and evaluation | USD 120 |
| First assortment goods | USD 400 |
| Domestic logistics, service, QC, packing and export allowance | USD 230 |
| Uncommitted reorder reserve | USD 250 |
| Total planning cash | USD 1,000 |
The combined logistics allowance is deliberately a placeholder. Replace it with a written, itemized quote and identify any excluded import or destination costs. If actual costs exceed that envelope, revise the assortment or the total budget before proceeding. Do not quietly consume the reorder reserve and continue describing it as available cash.
For the USD 400 goods envelope, imagine a hypothetical product price of USD 20 and twenty total units. One possible test is ten units in each of two colors of one style. Another is twelve in a core color and eight in an accent. These are arithmetic examples, not recommended demand ratios. The right split depends on your own audience, confirmed availability and test objective.
Compare cost per usable unit
Keep total cash outlay visible. Dividing the combined landed spending by ordered units can be useful, but also consider what happens if some pieces cannot be sold as intended. A lower product price is less attractive if the resulting shipment has unsuitable packing, missing accessories or unresolved specification differences.
Do not treat sample costs as automatically refundable or deductible from the next order. Ask the seller and desk whether any credit exists and record its conditions.
The sourcing request page identifies quantity, destination, packing and route as inputs to quote review. Use those inputs when comparing two proposed assortments rather than comparing only listing prices.
Set a reorder gate before you launch
Record receipts, sellable quantities, customer questions, returns and sales by variant. Compare time available for sale and exposure before declaring a color the winner.
Release the reserve only after reviewing the product’s condition, actual landed cost and the evidence relevant to your test. Reconfirm stock, specification, lead time and shipment assumptions.
Sources and next step
Service context checked 2026-10-16: 1688 Bags sourcing and QC inspection scope. The budgeting framework and examples are editorial planning tools, not observed customer outcomes.
Send your SKU list and budget for review, including the amount you want to retain for later orders.
Recalculate with your own inputs
The prefilled CNY figures are assumed planning inputs. Blank means unknown, while 0 means confirmed no charge. Missing fees stay listed and the tool still adds the known items. Samples are spending; the reorder reserve is separate cash. Entries stay on this page.
The subtotal includes only entered spending. Unquoted items are listed separately, so this is not a final landed price.
Reserve is cash kept for a later order. It is excluded from spending and cost per usable unit; adding it gives a planning cash floor, not a complete landed quote.
Request an itemized trial-order budget
Edit this local table, then copy it into your sourcing request. Entries are not saved or sent automatically.
Example / reference — edit the fields below
24 × 40 + 80 + 100 + 120 + 60 + 480 = 1800 CNY; tax/payment pending
Sources and calculation method
Research reference date: . This is a source-reference date, not a publication date or a hands-on test.
Method: the editorial comparisons use the cited specifications; worked calculations state their assumed inputs. Product-page descriptions do not establish physical fit, material performance or stock.
- 1688 Bags — itemized sourcing cost scope · · Service description; establishes scope, not an order result.
Questions before purchase
How many colors should a first order contain?
There is no universal number. Use the fewest variants needed to answer your test question while meeting confirmed seller minimums.
Should I spend the whole budget to get a lower unit price?
Compare total cash exposure and the value of retaining flexibility. A discount does not remove inventory risk or create money for a successful reorder.
Is the illustrative logistics allowance a 1688 Bags fee?
No. Every number in the example is hypothetical. Request current terms for your exact products, quantities, destination and packing plan.